Trung Thanh Industrial Park, Ninh Binh Province

Trung Thanh Industrial Park, Ninh Binh province

Trung Thanh Industrial Park, Ninh Binh province rsl 1
3D perspective planning map of Trung Thanh Industrial Park, Ninh Binh province

Trung Thanh Industrial Park received approval for its 1/2000 Subdivision Construction Plan under Decision No. 963/QĐ-UBND dated May 15, 2023 issued by the People’s Committee of Nam Dinh Province. The project subsequently obtained investment policy approval under Decision No. 1245/QĐ-TTg dated October 23, 2024 issued by the Prime Minister of Vietnam. On November 8, 2024, the People’s Committee of Nam Dinh Province officially announced the investment policy approval for the project involving the construction and operation of infrastructure at Trung Thanh Industrial Park.

  • Enterprise Registration Certificate No. 0601234443, first issued on May 10, 2022, and amended for the third time on October 20, 2025 by the Business Registration Division of the Department of Finance of Ninh Binh Province.
  • Investment Registration Certificate No. 8252221748, first issued on November 6, 2024 by the Management Board of Nam Dinh Industrial Parks (now the Management Board of Ninh Binh Economic Zones and Industrial Parks).

I. Overview of Trung Thanh Industrial Park

With a total investment capital of VND 1,657.098 billion, Trung Thanh Industrial Park covers an area of 200 hectares, including 134.04 hectares of leasable industrial land. The project is expected to hand over fully cleared industrial land to secondary investors by Q4/2026 and create approximately 21,600 jobs once operational.

Below is an overview of Trung Thanh Industrial Park presented by Redsunland:

Indicator Information
Project name Trung Thanh Industrial Park
Location Tan Minh commune, Ninh Binh province (formerly Trung Nghia commune, Y Yen district, Nam Dinh province)
Total area 200 ha
Operation term 50 years (2024–2074)
Occupancy rate 0%
Target industries Electronics and supporting industries; mechanical engineering and manufacturing; materials industries; food and beverage processing; textile and garment manufacturing; consumer goods production; paper, packaging and printing; pharmaceuticals, chemicals, medicinal products, and cosmetics
Main transportation connectivity Liem Son Interchange (Cau Gie – Ninh Binh Expressway), National Highway 21B, National Highway 1A
Building standards Maximum building coverage ratio: 70%; floor area ratio (FAR): 3.5; Maximum building height: 5 stories for factories and office buildings; Building setback: 6 m from roads and 3.5 m from factory boundaries
Labor force Ninh Binh province has a population of approximately 4.4 million people, including around 2.5 million workers. Region III minimum wage: VND 4,140,000/person/month.
Trung Thanh Industrial Park, Ninh Binh province rsl 2
Groundbreaking Ceremony of Trung Thanh Industrial Park held on August 21, 2025, in Tan Minh commune, Ninh Binh province

II. Location of Trung Thanh Industrial Park

Trung Thanh Industrial Park enjoys a strategic location with direct access to National Highway 1A and is situated along the extended North–South Expressway Corridor (Hanoi – Cao Bo – Rang Dong). The project is designed with primary access points connecting to DT495B Provincial Road to the north and the frontage road of the Cau Gie – Ninh Binh Expressway to the east.

Notably, the Liem Son Interchange officially commenced operation in June 2026, significantly enhancing the park’s regional connectivity. Located just 2 km from the Cau Gie – Ninh Binh Expressway, Trung Thanh Industrial Park offers convenient access to Hanoi, Noi Bai International Airport, and Hai Phong Port, providing a strong logistical advantage for manufacturers and investors.

Trung Thanh Industrial Park, Ninh Binh province rsl 3
Liem Son Interchange officially commenced operation and ETC toll collection on June 1, 2026

Boundaries

  • North: Adjacent to agricultural land in Thanh Tam and Liem Son communes, former Ha Nam Province.
  • South: Adjacent to Thanh Xa Road, agricultural land, and residential areas of Yen Thanh Commune, former Nam Dinh Province.
  • East: Adjacent to agricultural land and residential areas of Nhuong Hamlet, Yen Trung Commune, former Nam Dinh Province.
  • West: Adjacent to agricultural land and residential areas of Thanh Nguyen Commune, Thanh Liem District (former Ha Nam Province), and Bo Son Hamlet, Yen Thanh Commune, former Nam Dinh Province.

Transportation connectivity

  • 2 km to Liem Son Interchange (Km239+800 – Km242+900 on CT.01 Expressway)
  • 28 km to Ninh Binh City
  • 75 km to Hanoi City Center
  • 100 km to Noi Bai International Airport
  • 110 km to Hai Phong Port
Trung Thanh Industrial Park, Ninh Binh province rsl 4
Transportation connectivity of Trung Thanh Industrial Park

III. Infrastructure of Trung Thanh Industrial Park

Trung Thanh Industrial Park is planned with modern and synchronized infrastructure systems designed to meet the needs of domestic and international manufacturers.

Trung Thanh Industrial Park, Ninh Binh province rsl 5
Land use structure of Trung Thanh Industrial Park

Technical infrastructure

  • Internal transportation system: main boulevard width is 56 m, carriageway width: 10.5 m per side, sidewalk width: 6 m per side; secondary roads width: 22.5 m, carriageway width: 7.0 – 7.5 m per side, sidewalk width: 6 m per side
  • Power supply system: dedicated 110/22kV substation with a capacity of 2 × 63 MVA, overhead power lines mounted on reinforced concrete poles, electricity supplied from the 110/35(22)kV substation located in the northern infrastructure zone, distribution to 35/22/0.4kV substations throughout the industrial park, power connections can be customized according to investor requirements
  • Clean water supply system: water supplied by Nam Dinh Water Supply Joint Stock Company, total supply capacity: 10,800 m³/day, ring-network combined with branched pipelines ensuring stable flow and pressure throughout the industrial park
  • Stormwater drainage system: open drainage channels running along internal roads, channel widths ranging from 8–10 m
  • Wastewater treatment system: centralized wastewater treatment plant capacity: 8,000 m³/day, industrial wastewater design standard: 35 m³/ha/day, domestic wastewater volume calculated at 100% of supplied water. Wastewater collection pipelines are installed along road sidewalks and connected directly to the treatment plant

Service infrastructure

  • Security services: fire prevention and firefighting services, banking services, telecommunications services, logistics support, customs services

IV. Investment costs in Trung Thanh Industrial Park

  • Infrastructure management fee USD 0.6/m²/year
  • Electricity price according to EVN regulations
  • Clean water price VND 12,000/m³
  • Wastewater treatment fee VND 11,500/m³ (from Column B to Column A according to QCVN 40:2011) with payment schedule: 1st Payment: 30% deposit, 2nd Payment: 30%, 3rd Payment: 35%, 4th Payment: 5%
Trung Thanh Industrial Park, Ninh Binh province rsl 6
Project perspective of Trung Thanh Industrial Park

V. Investment incentives in Trung Thanh Industrial Park

Enterprises operating in Trung Thanh Industrial Park are entitled to the following incentives:

  • Land rental incentives: exemption from state land rental payments for 11 years, starting from 2024.
  • Corporate Income Tax (CIT): 100% CIT exemption during the first 2 years, 50% reduction of payable CIT during the subsequent 4 years
  • Import duty incentives: Import duty exemption for eligible machinery, equipment, and goods imported to form fixed assets for investment projects.

In addition to government incentives, investors receive comprehensive support from the project developer:

  • Assistance with investment licensing procedures and Investment Registration Certificates (IRC)
  • Support for company seal registration and tax code registration
  • Banking and financing connection services
  • Ongoing operational support throughout the production lifecycle

This article highlights Trung Thanh Industrial Park as a prime investment location for both domestic and international businesses. We believe this information from RSL Group is valuable to our readers.

Discover more about potential IPs/ICs in Vietnam here.

VI. RSL Group – leading investment consulting firm

When a business enters the stage of expanding production or building a new factory, there are numerous factors to consider – from selecting the right location, evaluating technical infrastructure, rental costs, and legal procedures to managing logistics, workforce, and supply chain efficiency.
Partnering with a professional consulting firm from the very beginning helps investors save time, costs, and resources while minimizing potential risks.
With nearly 4 years of experience successfully facilitating over 300 DDI and FDI projects totaling more than USD 4 billion in investment capital, Redsunland (a member of RSL Group) has become one of the leading investment consulting firms in Vietnam’s industrial real estate sector.
Thanks to its comprehensive service ecosystem and team of highly experienced consultants, investors partnering with RSL Group benefit from exceptional advantages:

  • Access the most competitive prices in the market, along with attractive investment incentive policies.
  • Negotiate directly with industrial park developers on behalf of investors regarding pricing, procedures, and all investment-related matters, while assisting in resolving legal issues and supporting factory design and construction.
  • Offer financial solutions with funding packages covering up to 80% of land and machinery value and 100% of factory and working capital costs.

👉 Contact RSL Group for detailed consultation on investment opportunities at Xuan Kien Industrial Park: Free consultation registration form

RSL Group – Comprehensive investment promotion solutions

Selecting the appropriate consulting partner is crucial for a successful investment in Vietnam. RSL Group, with an experienced team, extensive property portfolio, and comprehensive service ecosystem, is dedicated to providing optimal investment solutions for our clients.

Connect with us:

RSL Group Company Limited

Address: Charmvit Tower, 117 Tran Duy Hung street, Yen Hoa, Ha Noi

Hotline: (+84) 913.933.593 – (+84) 912.949.393

Website: redsunland.vn & rslgroup.vn

Email: info@rslgroup.vn

LinkedIn: linkedin.com/company/rslgroup

Fanpage: facebook.com/rslgroup.vn

Youtube: youtube.com/@rslgroup