Thang Long Thanh Hoa Industrial Park – Phase 1 received investment policy approval and investor approval under Decision No. 1316/QD-UBND dated April 29, 2025, issued by the Thanh Hoa Provincial People’s Committee. The Investment Registration Certificate was subsequently issued by the Nghi Son Economic Zone and Thanh Hoa Industrial Parks Authority on May 5, 2025. The project’s investment policy was later adjusted in September 2026.

I. Overview of Thang Long Thanh Hoa Industrial Park

Thang Long Thanh Hoa Industrial Park is planned to cover a total area of 645.2 hectares, with development divided into four phases. Phase 1 covers 167 hectares, with a total investment of VND 2,917 billion (approximately USD 115.8 million). The project aims to attract supporting industries and high-tech manufacturing, particularly Japanese enterprises and international investors seeking to establish production facilities within the supply chain network of Thang Long Industrial Parks across Vietnam.

Below, RSL Group provides an overview of Thang Long Thanh Hoa Industrial Park:

INDICATOR INFORMATION
Project name Thang Long Thanh Hoa Industrial Park
Location Dong Quang ward and Dong Tien commune, Thanh Hoa province (formerly Dong Yen commune and Dong Van commune, Thanh Hoa city; Dong Tien commune and Dong Thang commune, Trieu Son district)
Total area 645.2 ha (Phase 1: 167 ha)
Operating term 50 years (2025–2075)
Occupancy rate 0% (October 2026)
Target industries Electrical and electronics manufacturing, telecommunications, mechanical engineering, precision engineering, automotive and motorcycle industries, construction equipment, medical equipment, household appliance manufacturing, and supporting industries
Construction regulations Land designated for factories and industrial facilities covers 447.94 hectares, accounting for 69.43% of the total area. Maximum building density is 70%, maximum building height is 5 storeys, and maximum floor area ratio (FAR) is 3.5.

Thang Long Thanh Hoa Industrial Park – Phase 1 officially broke ground on the morning of March 11, 2026, with construction scheduled for completion by December 2027. Once completed, the project is expected to attract approximately 50–250 secondary investors leasing industrial land and developing manufacturing facilities, creating an estimated 13,000–40,000 jobs.

Thang Long Thanh Hoa Industrial Park
Delegates performing the groundbreaking ceremony for the infrastructure development and operation project of Thang Long Thanh Hoa Industrial Park – Phase 1

II. Location of Thang Long Thanh Hoa Industrial Park

Thang Long Thanh Hoa Industrial Park enjoys a strategic location adjacent to the Nghi Son – Sao Vang Road, also known as the road connecting the two ports. This major transportation corridor in Thanh Hoa Province connects Tho Xuan Airport with the Nghi Son Economic Zone, facilitating efficient cargo transportation and export activities. Its convenient access to key transportation infrastructure provides manufacturers with favorable conditions for domestic distribution, logistics operations, and international trade.

Transportation connectivity

  • Hac Thanh Ward Center: 17 km
  • Nghi Son Deep-Water Port: 68 km
  • North–South Expressway Interchange: 1 km
  • Tho Xuan Airport: 32 km
  • Hanoi City Center: 152 km

III. Infrastructure of Thang Long Thanh Hoa Industrial Park

Thang Long Thanh Hoa Industrial Park
Architectural and landscape planning, control map of Thang Long Thanh Hoa Industrial Park

As of September 2026, overall construction progress at Thang Long Thanh Hoa Industrial Park had reached nearly 50%, with multiple infrastructure components being developed simultaneously. The project is expected to be ready to welcome secondary investors from Q1/2027. Specifically, construction of the emergency retention pond had reached approximately 96% completion, while canal works and temporary road construction had achieved around 69% progress. Other infrastructure components, including the raw water reservoir, regulating reservoir, and pumping station, were also under active construction. Thang Long Thanh Hoa Industrial Park is planned with the following technical infrastructure:

Thang Long Thanh Hoa Industrial Park
Current development status of Thang Long Thanh Hoa Industrial Park – updated September 2026
  • Power supply system: Electricity will be supplied through connections to the 220kV Thanh Hoa substation and the 220kV Nong Cong substation, ensuring a reliable power supply for manufacturing and industrial operations within the park.
  • Clean water supply system: The industrial park plans to develop two new water supply stations and two reservoirs, with a combined water supply capacity of 30,000 m³/day. Raw water will be sourced from the water supply infrastructure development project serving the urban corridor along National Highway 47 and surrounding areas.
  • Wastewater treatment system: Two centralized wastewater treatment plants will be constructed, together with a dedicated wastewater drainage network designed to collect and treat wastewater generated throughout the industrial park. Wastewater Treatment Plant No. 1: 17,000 m³/day, wastewater Treatment Plant No. 2: 10,000 m³/day, total planned treatment capacity: 27,000 m³/day

IV. Investment costs at Thang Long Thanh Hoa Industrial Park

Investment costs at Thang Long Thanh Hoa Industrial Park will be updated by Redsunland as soon as the latest information becomes available.

V. Investment incentives at Thang Long Thanh Hoa Industrial Park

Enterprises investing in Thang Long Thanh Hoa Industrial Park are eligible for investment incentives in accordance with applicable Vietnamese laws and regulations.

VI. Companies operating in Thang Long Thanh Hoa Industrial Park

According to the developer of Thang Long Thanh Hoa Industrial Park, although the project is still under construction, it has already attracted interest from more than 20 enterprises across various industries. Potential investors represent a diverse range of manufacturing sectors, including electronic components, automotive parts, metal processing, food production, and packaging.

This growing investor interest highlights the project’s potential to become an important manufacturing destination in Thanh Hoa province, particularly for businesses seeking to expand their production networks and establish long-term operations in Vietnam. This article provides an overview of Thang Long Thanh Hoa Industrial Park (also known as the Western Thanh Hoa city Industrial Park), a promising investment destination in Vietnam for both domestic and international businesses. RSL Group hopes the information will provide valuable insights to investors and readers exploring industrial real estate opportunities in Vietnam.

Discover more about potential IPs/ICs in Vietnam here.

V. RSL Group – leading investment consulting firm

When a business enters the stage of expanding production or building a new factory, there are numerous factors to consider – from selecting the right location, evaluating technical infrastructure, rental costs, and legal procedures to managing logistics, workforce, and supply chain efficiency.
Partnering with a professional consulting firm from the very beginning helps investors save time, costs, and resources while minimizing potential risks.
With nearly 4 years of experience successfully facilitating over 300 DDI and FDI projects totaling more than USD 4 billion in investment capital, Redsunland (a member of RSL Group) has become one of the leading investment consulting firms in Vietnam’s industrial real estate sector.
Thanks to its comprehensive service ecosystem and team of highly experienced consultants, investors partnering with RSL Group benefit from exceptional advantages:

  • Access the most competitive prices in the market, along with attractive investment incentive policies.
  • Negotiate directly with industrial park developers on behalf of investors regarding pricing, procedures, and all investment-related matters, while assisting in resolving legal issues and supporting factory design and construction.
  • Offer financial solutions with funding packages covering up to 80% of land and machinery value and 100% of factory and working capital costs.

👉 Contact RSL Group for detailed consultation on investment opportunities at Xuan Kien Industrial Park: Free consultation registration form

RSL Group – Comprehensive investment promotion solutions

Selecting the appropriate consulting partner is crucial for a successful investment in Vietnam. RSL Group, with an experienced team, extensive property portfolio, and comprehensive service ecosystem, is dedicated to providing optimal investment solutions for our clients.

Connect with us:

RSL Group Company Limited

Address: Charmvit Tower, 117 Tran Duy Hung street, Yen Hoa, Ha Noi

Hotline: (+84) 913.933.593 – (+84) 912.949.393

Website: redsunland.vn & rslgroup.vn

Email: info@rslgroup.vn

LinkedIn: linkedin.com/company/rslgroup

Fanpage: facebook.com/rslgroup.vn

Youtube: youtube.com/@rslgroup